BP has contracted Wood Group Kenny to provide engineering design and project management services for the SURF infrastructure for the Quad 204 redevelopment west of Shetland. Wood Group Kenny (WGK) will be responsible for the design of USD 1.2 billion of subsea, pipeline and riser infrastructure for the project. It plans to assemble a 75-strong dedicated engineering team. Quad 204 involves replacement facilities for the Schiehallion and Loyal fields, and is designed to extend their production through 2035.