Pakistan: hydroelectric project

Mr Pervez Musharraf President of Pakistan has recently launched the PKR 130 billion Neelum Jhelum hydroelectric project aimed at producing 969MW power and helping the country meet its increasing energy requirements. Under the project water from the Neelum river will be diverted through a 47km long tunnel. A power house will be constructed at Chattar Kalas and the water will be released in river Jhelum. The project will produce 5.15 billion units of electricity annually.
Previous articleMXM series dry run pump
Next articleITT elects